1.Application of scroll professional air cooling h2o chiller
Utilised as air conditioning(often named industrial water chiller),such as utilized in hotel, theater, workplace creating and supermarket, colleges…
2.CZPTstars Commercial Air Cooling Scroll Water Chillers Characteristics:
1) Base frame and exterior panels are made of galvanized sheet.
two) Higher effectiveness compressor with R407C/R410A Refrigerant.
three) Contact style Lcd manage panel, and the management indicators are simpler to be transferred to the manage program
4) Openable cupboard door style for faster and simpler checking and servicing
five) Exterior rotor admirer guarantees lower noise and vibration
6) Pretty outlook and sharp edges reduction cabinet design
7) Large high quality copper tube coils created of thread technology
8) CZPT tests and operational take a look at carried out for each device before package in the manufacturing unit.
9)With full protection functions such as h2o circulation, higher/low force, section order, in excess of-present and so on.
3.Air Cooled Scroll Business Drinking water Chiller CZPT Datas
Air Cooled Chiller Unit(commerical kind) | |||||||||
Model ESSA- | 05STN | 10DTN | 12DTN | 20QTN | 25QTN | 20DTN | 25DTN | ||
Rated Cooling Ability | KW | fourteen | 28 | 34.5 | 58.two | sixty six | fifty eight | 67 | |
USRT | 4. | 8. | nine.8 | 16.6 | eighteen.8 | sixteen.five | 19.1 | ||
×1000 kcal/h | twelve. | 24.1 | 29.7 | fifty.1 | fifty six.eight | 49.9 | fifty seven.six | ||
Refrigerant | R407C | ||||||||
Evaporator | Tank Tube in Shell | Shell and Tube | |||||||
Condenser | Ripple Aluminum Fins all around Cooper Pipe | ||||||||
Model ESSA- | 25DTP | 40QTN | 50QTP | 80DTP | 100QTP | 160QTP | |||
Rated Cooling Ability | KW | sixty six | 106 | 130 | 230 | 290 | 460 | ||
USRT | eighteen.eight | 30.1 | 37. | 65.4 | eighty two.5 | 130.8 | |||
×1000 kcal/h | 56.8 | 91.2 | 111.8 | 197.8 | 249.4 | 395.six | |||
Refrigerant | R410A | R407C | R410A | ||||||
Evaporator | Shell and Tube | ||||||||
Condenser | Ripple Aluminum Fins close to Cooper Pipe |
4.Air Cooled Scroll H2o Chiller Main Parts Introduction
1)Copeland /Panasonic Compressor :Higher quality Scroll Compressor.
two)Fan: Effectively selected axial fan motor merged with huge fan blade, which give large air blow at lower rotate pace, minimizing vibration and sound.
3)Growth Valve: SXIHU (WEST LAKE) DIS./Danfoss /Emerson Expansion valve, with more specific control of refrigerant circulation program, which enhance warmth pump working capability and efficiency under diverse ambient problems.
4)High Successful water aspect warmth trader:
a) Tube in shell tank type: Enhance design of the two inner and outer screwed tube, it assists to increase heating exchange performance, and give better heating ability. The unique style of liquid refrigerant circulating tube on the bottom of condenser guarantees the warmth pump system run smoothly in extreme functioning issue.
b)Brazed-plate evaporator: produced from stainless steel attributes a brand-new diagonal style to greater make use of heat exchanging surfaces.
c)Shell and tube dry kind evaporator: with internal grooved cooper tubes optimizes the cooling and heating performance.
Self-cleaning, high intensity, anti-shaking design and style and heat insulation masking materials make sure shell and tube heat exchanger unstained,dependable,silent,hugely productive.
five)Air Side Heat exchanger: Blue hydrophilic fin and copper tube warmth exchanger.
6)AC contactor & Thermal relay: Substantial high quality FUJ/Schneider /EATON or other brand name contactor and thermal relay can freely flip on/off a lot more moments.
seven)Xihu (West Lake) Dis.nized PCB Style: Navy degree PCB elements, smart managing plan reinforced a trustworthy procedure of the heat pump unit. Specific coloured wiring layout on the PCB offers great usefulness in set up and further servicing.
eight)Noise Isolated Materials: Making use of large top quality aerial sound isolated materials, sounds and vibration is prevented completely(optional).
five. CZPTS Business Air Coooling Scroll Drinking water Chiller Series
six.About US
We, CZPTS, which set up in 12 months 2006, is a contemporary hello-tech organization, specializing in Heating Air flow Air Conditioning and CZPT Refrigeration study, development, generation, product sales and engineering services which be always here to supply pursuing support:
one) Venture technique style
two) CZPT help
three) Production production
four) Delivery
5) Set up
6) Test and commissioning
seven) Fix and servicing
8) After sale support, and so forth
seven.FAQ
Q: What is the warranty of merchandise?
A: Warranty: 12~24 months right after Bill of Lading day. Any unartificial failure happened within the interval, we’ll offer you the spare parts for cost-free, and permanent technological assistance & session all existence extended for the equipment
Q:Are you a manufacturing facility?
Yes, we are a professional producer for much more than thirteen years
Q:How do you check out the merchandise?
We examine all the resources when they arrive, and have location inspection in the course of manufacturing approach. All goods will be tested and double inspected ahead of shipping and delivery, delivering one hundred% guarantee for clientele.
Q:How and when can I get the quotation?
Send out us the inquiry or go away us message. We will get back again to you in one hour during the functioning time. All messages will be replied whenever they comes.
Q:What is actually your payment terms?
Normally we accept T/T or LC. thirty% deposit. Other payment conditions can be discussed when orders confirmed.
Q:Exactly where is your factory Found? How can I pay a visit to there?
We situated in HangCZPT, ZheJiang Province, which is in close proximity to HangCZPT CZPT Airport. We can select you up from the airport . You are warmly welcome to check out us
Q:Do you supply OEM support?
Sure! We provide OEM and ODM services.
Q:What is the lead time for your goods?
Normally twenty five~thirty workdays. For urgent orders, we can make special arrangement to fulfill your ask for.
eight.CZPTer pay a visit to us
nine.Air cooled h2o chiller shipping and delivery or container loading
10. Installation instruction or set up image, undertaking pictures
A,Location choice of set up Warmth pump
1). Heat pump ought to be set up in a large area, and have very good air stream problem.
2). Air inlet and outlet have to be a clear road, the distance from barrier to inlet and outlet must be longer than 2m.
3). Set drain ditch or drain outlet, so that can drain water very easily.
4). The set up base or bracket need to be firm, make positive warmth pump perform balancely.
5). Make positive heat pump is vertical, can’t be slanted.
6). Do not set up heat pump at the area in in which there is loads of pollutional and corrosive gasoline or sand or fallen leaves.
7). The installation location cannot be around inflammable, flammable issue or fire.
8). Set up:
—The set up foundation can be concrete design, or metal bracket, and have to use anti-vibration rubber pad, And the floor should be clean.
—The layout of installation base can be according to warmth pump fat.
—The warmth pump base need to be mounted by bolt.
B,Pipe relationship
The drain pipe and overflow pipe should be mounted near drain ditch or drain outlet, effortless to drain, and put in drain water valve on drain pipe just before magnetic valve there must be support valve on water pipe.
If use plastic pipe (such as PPR pipe or Stomach muscles pipe), consumers ought to think about pipe broaden and contract difficulty amongst heat pump and drinking water tank.
Water source valve and minimize-off valve probably need insulation (in accordance to local temperature condition),keep away from frost crack.
C,Water pipe system installation
Drinking water pipe need to be straight, and the prepare ought to be sensible, lessen bend as small as achievable. Minimize the water pipe resistance.
There are unable to be leaking at any location of pipe.
Right after all equipments and pipes set up completed, consumers should take a look at drinking water force, and travel air out, drain filthy out, make sure h2o cycle technique is clean. Following validate there is not any issue, then insulate all scorching water pipes.
D,Power source wiring
220V heat pump use single phase energy offer, 380V heat pump use a few period power offer, wire line is 3phase 4lines, A B C connects live line, N connects null line, E connect earth. Be certain not to join N line to stay line of electrical power provide.
1).When repairing, remember to change electricity offer at “off” side.
2).Power source connecting method:make sure a equipment power supply is lower off prior to its set up is finished. Install energy offer switch at suited area, Use rubber gap for wiring line in electric powered box.
Energy offer demand:
220V rated voltage±10%
380V rated voltage±10%
frequency:50Hz rated frequency±2%
3).if electrical power supply fluctuation is out of desire, you should don’t start your warmth pump.