Manufacturing facility Automated water bottle bopp opp very hot melt Labeling Equipment price
Machine Feature:
The bottles are picked up by the infeed starwheel and transferred to the bottle table. The bottle rotation starts when they are positioned among bottle plates and centering bells.
The speed of the feed roller is modified to the needed label size for continuous net stress. A normal threading device ensures optimal film feed. In the reducing device, the labels are specifically lower whilst a PLC command and servo-motor give an exact cut-off position.
Two slim strips of very hot soften glue the labels jointly, which are applied by a heated glue roller to the foremost and trailing label edges. The label with the glue strip on its top edge is transferred to the container. This glue strip assures an specific label positioning and a constructive bond. As the container is rotated for the duration of label transfer, labels are applied tightly. Gluing of the trailing edge guarantees proper bonding.
CZPT Parameters :
Name |
OPP Hot Melt Labeling Device |
Power offer |
A few-stage 380V 60 Hz 5000W |
Machine proportions: |
3650mm×1700mmX 2571mm(can be modified by customer requirements) |
Method of speed adjustment: |
uninterrupted – alter charge |
Labeling precision: |
±1mm |
Labeling pace |
4000-15000bph |
Maximum label width: |
200mm(normal width, can be altered ) |
The maximum outer diameter of label |
600mm |
Paper main Very hot melt |
152 mm |
Labeling glue: |
glue at equally finishes of every single label with scorching soften |
Gluing temperature: |
120~160ºC |
Labeling sort for goods: |
appropriate for round or square containers created of plastic, metal, glass |
Type of label: |
opp, bopp ,paper-plastic composite movie ,paper label |
Labeling stations: |
12per cycle |
Machine bodyweight: |
about 3000 kg |
Mechanical Components:
Transportation establishment | TRANSTECNO motor 750W(with deceleration by TRANSTECNO ), inverter pace handle |
CZPT | Italy FLEXON LF820-K325 industrial nylon chain plate conveyor |
Mainframe transportation establishment | TRANSTECNO motor two.2Kw (with deceleration by TRANSTECNO) |
Sub bottle establishment | industrial worm sub bottle institution |
Into bottle institution | with worm sub bottle establishment and starwheel position feeding establishment to guarantee the accuracy and steadiness of loading |
Placement establishment | Mechanical pre-location , employing the camwheel establishment to planish the bottle for label positioning |
Labeling establishment | Containers are decide up by rotary wheel ,labeling in the course of the rotation. |
Supply label establishment | high velocity servo opp label source program (push by servo-motor) |
Urgent label establishment | Arc brush device |
Xihu (West Lake) Dis.d bottle institution | alter by double coordinate part guide rail |
Glue offer method | sizzling soften glue supply method(German SEIMEC management program) guarantees the accuracy and uniformity of gluing |
Safety component:
Protection security | In buy to maintain the operator protection ,when the equipment is working you should shut the protective doorways |
Absence of label alarm | Established an alarm to remind the operator to modify the label when the label will be use out |
Lack of bottle alarm | When lack of the bottle the device will end and make an alarm .The machine will restart automatically as quickly as the bottles have been set that will aid on-line generation |
Leak of labeling alarm | To control the good quality of labeling |
Force screening | When the stress can not meet up with the equipment prerequisite ,the device will cease to against bad merchandise make |
Vacuum tests | When the vacuum can not meet the gear prerequisite ,the device will end to from undesirable merchandise generate |
Temperature tests | When the temperature can not meet the gear requirement , the device will end to from undesirable products produce |
Packing and Shipping:
Manufacturing facility:
Our servies:
Just before the buy:
We will make detailed resolution for you based on your requirments.
We will send you movies of our products to know far more about our devices.
If you are ready to pay a visit to our factory,we will choose you up at a nearby airport/station.
Soon after the purchase:
We will commence to make equipment and update the progress.
Our engineer will draw the structure for you.
Following-income service:
Set up our engineer to your manufacturing unit to put in devices if you need,prepare your staff until they can function equipment effectively.
Supply you 2 several years guarantee with spare areas 2 year totally free.
24 several hours for engineer response (all solutions element 5days in client hand by Intl’ courier)