Common Description
Outfitted using the zero leak bidirectional checking sole-noid valves, this electrical power unit is intended for the operation of two independent circuits. Which are respectively for your principal and subordinate platforms with the double scissors lift. Two cut-off valves are made use of for decreasing the machine manually in case of energy reduction. If a lot more independent circuits are expected for the application please make contact with us for availability.
Remark: 1. Please seek the advice of our sales engineer for the various pump displacement, motor power or tank capability.
2. CSA or UL licensed motors can be found on request.
Special Notes
1. The AC motor is of S3 duty cycle, which may only work intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
two. Clean the many hydraulic parts concerned just before installation of the power unit.
three. Viscosity of the oil shoud be 15~46 cst,and the oil must be clean and cost-free of impurities,N46 hydraulic oil is recommended.
4. The power unit really should be mounted vertically.
5. Check the oil degree from the tank following the original running of your power unit.
six. Oil changing is required after the preliminary one hundred operation hrs,afterwards as soon as every single 3000 hrs.