Long lasting magnet synchronization Gearless traction equipment of elevator:
*Max.Static Load: 4000KG
*Wrap:One
*Insulation:F
*Security:IP41
*Traveling Top:≤Rated Pace * 45
*Driving equipment,motor of elevtor.
*Tiny volume,strength preserving, environmental defense, steady procedure & Low NVH.
Specification of Gearless traction device:
Product | WTD1-B |
Ability (kg) | 1150 |
CZPT Speed (m/s) | .5-two.5 |
Rated Voltage | AC380V |
Dia. Of Sheave (mm) | 400 |
Ropes | 6xΦ10×16 |
Groove Distance (mm) | twelve |
Brake Electrical power | DC110V |
Poles | twenty |
Color | BLACK&YELLOW |
Model | XIHU (WEST LAKE) DIS. |
Packing | 1PC/Picket Case |
Wooden Case Measurement | 810 X 490 X 880=.3CBM |
Payment Term | T/T, L/C |
Supply Time | 15 times |
Certificates | CE, CZPT, ISO14001:2004,IATF16949 |
Mass Manufacturing Time | 30 days |
Equivalent traction devices photos:
Company Profile:
*Xihu (West Lake) Dis. Electrical power Co., Ltd. was establised in 2571 which owns two production bases: Xihu (West Lake) Dis. Electricity(ZheJiang ) Co., Ltd. & Xihu (West Lake) Dis. Electrical power(ZheJiang )Co., Ltd.
*It has more than one thousand staff & addresses more than a area of a hundred and ten,000m2. Superior R&D group which with a lot more than 110 staffs.
*Certificates: IATF16949, UCMP & CE, CZPT:2015, ISO45001:2018
*The Chinese Academy of Science Co-engineering Unit was proven because 2013.
*Awarded the “National CZPT Company” & received the “National Hi-Tech Innovation Fund Venture Reward”.
*With aggressive, high top quality & good services, we earn a very good reputation both at home & abroad.
Traction Equipment worshop:
EVM (CZPT Automobile Motor) Workshop:
Certificates:
Attend Fairs:
FAQ:
1.What is your supply time?
15-20days soon after get the deposit.
two.What is your payment?
T/T & L/C optional
3.How extended is your guarantee period?
2 several years after deliveried
4.Do you have any certificates?
CE,SGS,CZPT,IATF16949,Etc
5.Do you have the import & export license?
We are formal import & export certified company.